Client - Merlin Entertainment Group US Holdings, Inc.
Location - Carlsbad, CA
Surface Area - 2.4 Acres
Value - $6,000,000
Architect - R.W. Apel Landscape Architects, Inc.
The 2.4 acre LEGOLAND Chima Water Park Expansion featured a 240,000 gallon wave pool, as well as a smaller wave pool with water slides. Additional elements to the scope of work include a new dining facility and a 2,000 square foot restroom building and a locker/ changing room structure. Another essential part of the project was the themed rock work that was carved along various walkways throughout the site.